First Floor: OSD Production Block, Packing Area, Change Rooms, Emergency Staircases and Airlocks etc. and Exhaust System / Technical Equipment Areas.
Second Floor: Technical / Ducting Areas etc. Engineering Offices, Emergency Staircases, Central Staircase and Lift Lobby, Toilets and Airlocks etc.
Third Floor: Sterile, Lotion Production, Packaging Areas, Emergency Staircases, Central Staircases and Lift Lobby, Change Rooms and Airlocks etc.
Fourth Floor: Blister and Packaging Areas, Change Rooms, Emergency Staircases and Airlocks etc., Central Staircase, Lift Lobby etc., and AHU Areas.
Other Features: Utility Block (over the Utility Block developed with New Production Building)