We produce a coordinated BIM model after carrying out clash detection among all the trades (Architecture, Structure, Concrete, Mechanical, Electrical, Plumbing, Fire Protection, etc.).
Clashes are resolved through sharing 3D clash snapshot.
Clashes are resolved by changing elevation, re-routing utilities and re-sizing. Value Engineering is also offered to recover system efficiency, reduce costs, energy savings and easier construction and maintenance.